# Shanshan plans RMB 5.106bn 150,000t anode integrated base in Baotou, 5,000t graphitization add-on

- Source: JW Insights (T2)
- Published: 2026-01-01
- Score: 12.4
- Tags: Capacity, Cleanroom
- Original: http://www.laoyaoba.com/n/1112924

## Intelligence brief

### What happened Ningbo Shanshan Co., Ltd. (Shanshan) published an outbound investment announcement stating it intends to build a new integrated production base for lithium-ion battery anode materials with an annual capacity of 150,000 tonnes in Qingshan District, Baotou City, Inner Mongolia. The total project investment is approximately RMB 5.106 billion, of which fixed-asset investment is approximately RMB 4.318 billion. The matter has been reviewed and approved by the third meeting of the company's twelfth board of directors and still needs to be submitted to the company's shareholders' meeting for review. According to the announcement, rapid growth in global new energy vehicles and energy storage is driving fast growth in demand for lithium battery anode materials. Combined with the company's current anode material capacity scale, the capacity gap will continue to widen and needs to be filled through a new integrated base to ensure delivery of customer orders. After preliminary research and demonstration, and taking into account multiple dimensions including upstream raw material supply, graphitization processing supporting resources, and regional industrial support policies, the company plans to implement this investment. The investment and construction entity is the company's subsidiary Inner Mongolia Shanshan Technology Co., Ltd. The project plans to build anode material production workshops for each process step, warehousing, utilities and environmental protection works, and office and living facilities. Once completed, it will form an integrated annual production capacity of 150,000 tonnes of lithium-ion battery anode materials, and will additionally be equipped with 50,000 tonnes of graphitization capacity to fill the graphitization gap at the Jiuyuan plant. The construction period is 17 months, with planned commencement in March 2027 and planned completion in July 2028. The project funding source is the company's self-raised and own funds. The announcement shows the project is still in the preliminary preparation stage. The feasibility study has been completed, and a conditional investment cooperation agreement has been signed with the local government for the Inner Mongolia Shanshan Technology Co., Ltd. high-performance lithium battery anode material production base project. Under the agreement, the Qingshan District People's Government of Baotou will coordinate with the Baotou Municipal People's Government to include the project in municipal key project management and in the autonomous region-level key project library for key support; it will also provide support for project land and supporting infrastructure construction, project electricity use, and pre-approval procedures; and will help apply for relevant tax preferences, industrial awards, science and technology subsidies, and other related reward funds. The agreement will take effect after internal project initiation, board, and shareholders' meeting decision-making procedures and announcement. Implementation of the project still requires approval or filing from government authorities such as environmental impact assessment and energy assessment. The company stated that this project investment is an important measure to accelerate the landing of key projects after the entry of state-owned capital and to implement the "15th Five-Year Plan" development plan. It is conducive to relying on the resources and strategic advantages of state-owned shareholders, seizing industry development opportunities, expanding high-quality capacity, and meeting growing demand for anode materials in power battery and energy storage battery markets. After the project is completed and put into production, it will form capacity synergy with the company's existing Qingshan and Jiuyuan plants, better match the medium- and long-term order needs of downstream core customers, and consolidate the company's core competitiveness in the lithium battery anode industry. ### Key figures - Annual capacity: 150,000 tonnes of lithium-ion battery anode materials (integrated) - Additional graphitization capacity: 50,000 tonnes - Total project investment: approximately RMB 5.106 billion - Fixed-asset investment: approximately RMB 4.318 billion - Construction period: 17 months - Planned start: March 2027 - Planned completion: July 2028 - Location: Qingshan District, Baotou City, Inner Mongolia - Investment entity: Inner Mongolia Shanshan Technology Co., Ltd. - Funding source: self-raised and own funds - Approvals: board approved; pending shareholders' meeting; EIA and energy assessment approvals/filings still required ### Why it matters to ebm-papst This is a downstream battery-materials capacity project, not a direct fan or motor procurement announcement. For ebm-papst, the relevant signal is the build-out of large lithium-ion anode and graphitization capacity in Inner Mongolia, which typically requires cleanroom-class environmental control, process cooling, exhaust handling, and air movement equipment in material preparation, graphitization, and packaging areas. Assessment (inference): the 2027–2028 construction window means any air-technology specification and procurement activity would likely occur closer to detailed engineering, so this is a medium-term pipeline signal rather than an immediate order opportunity. Assessment (inference): Shanshan's state-owned-capital-backed expansion and its stated focus on power and energy storage battery customers suggest continued Chinese battery-materials capex, which supports demand for high-efficiency, low-energy air movement solutions in battery material plants. Assessment (inference): ebm-papst should treat this as a market signal to track Baotou/Inner Mongolia battery-material cluster projects and to position cleanroom and process-air solutions with EPCs and OEMs serving anode material lines. No specific figures on fan, motor, or air-handling content were disclosed.

## Full text (English translation)

21 hours ago: Shanshan plans to invest in and build an integrated base project with an annual output of 150,000 tonnes of lithium-ion battery anode materials.

Recently, Ningbo Shanshan Co., Ltd. issued an outbound investment announcement. The company plans to build a new integrated base project with an annual output of 150,000 tonnes of lithium-ion battery anode materials in Qingshan District, Baotou City, Inner Mongolia. The total project investment is approximately RMB 5.106 billion, of which fixed-asset investment is approximately RMB 4.318 billion. The matter has been reviewed and approved by the third meeting of the company's twelfth board of directors and still needs to be submitted to the company's shareholders' meeting for review.

According to the announcement, with the rapid development of global new energy vehicles and energy storage, demand for lithium battery anode materials is growing rapidly. Combined with the company's current anode material capacity scale, the capacity gap will continue to widen and needs to be filled through a new integrated base to ensure delivery of customer orders. After preliminary research and demonstration by the company, and taking into account multiple dimensions such as upstream raw material supply, graphitization processing supporting resources, and regional industrial support policies, the company plans to implement this investment.

The investment and construction entity of this project is the company's subsidiary Inner Mongolia Shanshan Technology Co., Ltd. The project plans to build production workshops for each process of lithium-ion battery anode materials, warehousing, utilities and environmental protection works, office and living facilities, etc. After completion, it will form an integrated production capacity of 150,000 tonnes of lithium-ion battery anode materials per year, and will additionally be equipped with 50,000 tonnes of graphitization capacity to fill the graphitization gap at the Jiuyuan plant. The project construction period is 17 months, with a planned start time of March 2027 and a planned completion time of July 2028. The project funding source is the company's self-raised and own funds.

The announcement shows that this project is still in the preliminary preparation stage. The project feasibility study has been completed, and a conditional effective "Inner Mongolia Shanshan Technology Co., Ltd. High-Performance Lithium Battery Anode Material Production Base Project Investment Cooperation Agreement" has been signed with the local government. The agreement stipulates that the Qingshan District People's Government of Baotou City will coordinate with the Baotou Municipal People's Government to include this project in municipal key project management and in the autonomous region-level key project library, giving it key support; and will provide relevant support for the project's land and its supporting infrastructure construction, project electricity use, and project pre-approval procedures; and will help apply for relevant tax preferences, industrial awards, science and technology awards and subsidies, and other related reward funds. The agreement will take effect after completing internal project initiation, board of directors, shareholders' meeting and other "three important and one large" decision-making procedures and announcement. Implementation of this project still requires obtaining approval or filing from government authorities such as environmental impact assessment and energy assessment.

The company stated that this project investment is an important measure for the company to accelerate the landing of key projects after the entry of state-owned capital and to implement the "15th Five-Year Plan" development plan. It is conducive to the company relying on the resources and strategic advantages of state-owned shareholders, seizing industry development opportunities, expanding high-quality capacity, and meeting the growing demand for anode materials in markets such as power batteries and energy storage batteries. After the project is completed and put into production, it will form capacity synergy with the company's existing Qingshan and Jiuyuan plants, better match the medium- and long-term order needs of downstream core customers, and consolidate the company's core competitiveness in the lithium battery anode industry.

## Full text (original)

近日，宁波杉杉股份有限公司发布对外投资公告，公司拟在内蒙古包头市青山区新建年产15万吨锂离子电池负极材料一体化基地项目，项目总投资约51.06亿元，其中固定资产投资约43.18亿元。该事项已经公司第十二届董事会第三次会议审议通过，尚需提交公司股东会审议。
根据公告，随着全球新能源汽车与储能的高速发展，锂电池负极材料需求快速增长，结合公司负极材料当前产能规模，产能缺口将持续扩大，需通过新建一体化基地补齐，以保障客户订单交付。经公司前期调研论证，综合上游原料供给、石墨化加工配套资源、区域产业扶持政策等多维度因素，公司拟实施本次投资。
本项目投资建设主体为公司下属子公司内蒙古杉杉科技有限公司。项目拟建锂离子电池负极材料各工序生产车间、仓储、公辅及环保工程、办公生活设施等，建成后将形成年产15万吨锂离子电池负极材料一体化生产能力，并另配套5万吨石墨化产能，以补齐九原工厂石墨化缺口。项目建设期为17个月，计划开工时间为2027年3月，计划竣工时间为2028年7月。项目资金来源为公司自筹及自有资金。
公告显示，本项目尚处于前期筹备阶段，目前已完成项目可行性研究工作，并与当地政府签署了附条件生效的《内蒙古杉杉科技有限公司高性能锂电负极材料生产基地项目投资合作协议》。协议约定，包头市青山区人民政府协调包头市人民政府将本项目纳入市级重点项目管理，并纳入自治区级重点项目库，予以重点扶持；并对本项目在项目用地及其基础配套建设、项目用电、项目前置审批手续等给予相关支持；帮助申报相关税收优惠、工业领域奖项，争取科技类奖补资金及其他相关奖励资金等。该协议待完成内部立项、董事会、股东会等“三重一大”决策程序及公告后生效。本项目实施尚需取得环评、能评等政府相关主管部门的审批或备案。
公司表示，本次项目投资是公司在国资入主后加速推进重点项目落地、落实“十五五”发展规划的重要举措，有利于公司依托国资股东资源与战略优势，抢抓行业发展机遇，扩充优质产能，满足动力电池及储能电池等市场对负极材料日益增长的需求。项目建成投产后，将与公司现有青山、九原工厂形成产能协同，更好匹配下游核心客户的中长期订单需求，夯实公司在锂电负极行业的核心竞争力。
