英伟达将特斯拉与维谛列入合格AI工厂基础设施供应商
情报详报
What happened NVIDIA launched the DSX Ready program on Sept. 21, a qualification framework for power-storage and cooling equipment used in AI-factory designs. Under the program, NVIDIA listed Tesla and Vertiv among qualified providers, alongside Hitachi Energy and LG Energy Solution in the battery energy storage system (BESS) category, and LG Electronics and LiquidStack in the cooling distribution unit (CDU) category. The program opened with two categories: BESS and CDUs. BESS providers must conduct qualification tests and submit supporting data within a defined qualification boundary for review. CDU providers use NVIDIA's CDU self-qualification suite to determine whether their products meet applicable functional requirements. DSX is described as a system-level framework spanning compute, networking, power, cooling, facilities and software. Its initial categories address supplying power to dynamic computing loads and removing heat from high-density systems. NVIDIA stated that qualification does not replace site-level engineering or indicate site-level stability, and it did not identify a specific Tesla battery product or Vertiv CDU model. Vertiv's OneCore Rubin DSX infrastructure design uses simulation-ready power and cooling models, validated interfaces and standardized modular infrastructure blocks rated at 12.5 megawatts. Scott Armul, Vertiv's chief product and technology officer, said integrating simulation-ready infrastructure models into the NVIDIA Vera Rubin DSX design gives Vertiv "the repeatable building blocks and validated interfaces necessary to accelerate the path from design to operational readiness." NVIDIA said it will expand DSX Ready to additional infrastructure and software categories over time. ### Key figures - Program launch date: Sept. 21 (year not stated in the source; the item is dated 2026-09-23) - Initial categories: 2 (BESS and CDUs) - Qualified BESS providers: 3 — Hitachi Energy, LG Energy Solution, Tesla - Qualified CDU providers: 3 — LG Electronics, LiquidStack, Vertiv - Vertiv modular infrastructure blocks rated at: 12.5 megawatts - No pricing, volume, revenue, market-share or delivery-timeline figures were disclosed. ### Why it matters to ebm-papst The DSX Ready program creates a vendor-qualification gate for AI-factory power and cooling equipment, with NVIDIA defining the functional requirements that BESS and CDU suppliers must meet. Vertiv's inclusion, and its OneCore Rubin DSX design with 12.5 MW modular blocks, signals that a major thermal-management player is aligning its reference architecture directly with NVIDIA's AI-factory framework. Assessment (inference): For ebm-papst, this is primarily a market signal and a potential channel consideration rather than an immediate competitive threat, since the named categories cover battery storage and coolant distribution, not air-moving components. However, CDUs and high-density cooling loops depend on fans and blowers, so qualification of CDU vendors could shape which air-movement suppliers get designed into AI-factory reference architectures. Assessment (inference): ebm-papst should monitor whether NVIDIA extends DSX Ready to additional infrastructure categories, as that could open a qualification path for fan and blower products, and should track Vertiv's OneCore Rubin DSX design as a possible customer platform for high-static-pressure, high-efficiency fan solutions. Assessment (inference): the absence of disclosed volumes or timelines means the near-term revenue impact is uncertain; the strategic value lies in early engagement with qualified CDU and BESS providers before AI-factory designs standardize.
原文全文
Nvidia Lists Tesla and Vertiv as Qualified AI-Factory Infrastructure Providers
The DSX Ready program covers battery energy storage systems and cooling distribution units, while qualification does not replace site-level engineering.
Nvidia listed Tesla and Vertiv as qualified providers in a new program for power-storage and cooling equipment used in AI-factory designs, giving the companies recognition under Nvidia’s infrastructure requirements.
The DSX Ready program launched Sept. 21 with two categories: battery energy storage systems (BESS) and cooling distribution units (CDUs). The qualified BESS providers are Hitachi Energy, LG Energy Solution and Tesla. The CDU group includes LG Electronics, LiquidStack and Vertiv.
BESS providers must conduct qualification tests and submit supporting data within a defined qualification boundary for review. CDU providers use Nvidia’s CDU self-qualification suite to determine whether their products meet applicable functional requirements.
DSX is a system-level framework spanning compute, networking, power, cooling, facilities and software. Its initial categories address the need to supply power to dynamic computing loads and remove heat from high-density systems.
Qualification does not replace site-level engineering or indicate site-level stability. The Nvidia announcement also does not identify a specific Tesla battery product or Vertiv CDU model.
Vertiv’s OneCore Rubin DSX infrastructure design uses simulation-ready power and cooling models, validated interfaces and standardized modular infrastructure blocks rated at 12.5 megawatts.
“By integrating simulation-ready infrastructure models into the NVIDIA Vera Rubin DSX design, Vertiv is providing the repeatable building blocks and validated interfaces necessary to accelerate the path from design to operational readiness,” Scott Armul, Vertiv’s chief product and technology officer, said.
Nvidia will expand DSX Ready to additional infrastructure and software categories over time.