# SEMI: Q2 2026 Global Silicon Wafer Shipments Up 7.4% YoY; DRAM Prices Surge, Smartphone SoC Shipments Down 15%

- Source: JW Insights (T2)
- Published: 2026-01-01
- Score: 37.0
- Tags: Market data, Datacenter
- Companies: Delta Electronics (2308.TW), NVIDIA, TSMC, Meta
- Original: https://www.laoyaoba.com/n/1074556

## Intelligence brief

### What happened On July 29, 2026, SEMI's Silicon Manufacturers Group (SMG) released its quarterly silicon wafer industry analysis, reporting that global silicon wafer shipments in Q2 2026 reached 3,573 million square inches (MSI), a 7.4% year-over-year increase from 3,327 MSI in Q2 2025, and a 9.1% sequential increase from 3,275 MSI in Q1 2026. Silicon wafers are the fundamental substrate for most semiconductor products, essential for all electronic devices. Separately, Counterpoint Research reported that smartphone memory prices surged over 80% quarter-over-quarter in Q2 2026, significantly raising BOM costs across all segments. DRAM has overtaken SoC as the most expensive single component in flagship smartphones. The report also noted that the introduction of future 2nm flagship SoCs will further increase BOM costs, potentially compressing OEM gross margins despite price hikes. Additionally, Counterpoint Research reported that global smartphone SoC shipments declined 15% year-over-year in H1 2026, driven by rising memory costs, cautious inventory management by OEMs, and longer replacement cycles. MediaTek and Qualcomm saw shipments drop over 25% YoY, while Apple, Samsung, Google, and UNISOC experienced robust growth. TrendForce indicated that co-packaged optics (CPO) has officially entered mass production, with Nvidia shipping its new Spectrum-X CPO switches to select partners and Broadcom's 51.2T Bailly CPO switch in small-volume production. However, supply constraints in optical engines, silicon photonics chips, and advanced packaging are key bottlenecks. Bank of America Global Research raised its DRAM price forecast, expecting Q3 contract prices to rise 30-40% quarter-over-quarter, citing AI server demand squeezing supply. This is higher than TrendForce's earlier forecast of 13-18%. ### Key figures - Global silicon wafer shipments in Q2 2026: 3,573 MSI, up 7.4% YoY and 9.1% QoQ. - Smartphone memory prices in Q2 2026: up over 80% QoQ. - Low-end smartphone BOM cost: up 70% YoY; mid-end: up 52% (memory accounts for 40% of BOM); flagship: up nearly 50%. - 1TB iPhone 18 Pro Max cost increase vs. iPhone 17 Pro Max: nearly $300. - H1 2026 smartphone SoC shipments: down 15% YoY; MediaTek and Qualcomm down over 25% YoY. - 2026 full-year smartphone SoC shipments: expected down 14% YoY; entry-level segment down over 30%. - Nvidia Spectrum-X CPO switch: processing capacity 400 Tb/s, production expansion in H2 2026. - Broadcom Bailly CPO switch: 51.2T, reduces power consumption by 70% vs. pluggable modules; Meta has completed deployment validation. - BofA: Q3 DRAM contract prices expected to rise 30-40% QoQ; 16Gb DDR5 spot ~$50, DDR4 ~$80; 64GB server module contract >$1000 (DDR5 ~$1400). - Alphabet Q2 cloud revenue up 82% YoY, backlog $514B; 2026 capex guidance raised to $195-205B (from $180-190B), with 2027 expected to increase significantly. - Korea July 1-20 exports: $54.9B, up 52.3% YoY; semiconductor exports $22.1B, up 80.6% YoY, accounting for 40.3%. ### Why it matters to ebm-papst The surge in DRAM prices and memory costs directly impacts the cost structure of electronic devices, potentially affecting demand for data center and semiconductor manufacturing equipment. As AI servers and high-performance computing drive demand for advanced packaging and CPO, the need for precise thermal management and cleanroom environments increases. ebm-papst, as a leading provider of fans and motors, could see opportunities in cooling solutions for data centers and semiconductor fabs. The expansion of CPO and advanced packaging may require more efficient cooling systems, aligning with ebm-papst's expertise. Assessment (inference): The rising complexity and power density of AI and networking equipment will likely increase demand for high-performance cooling solutions, positioning ebm-papst to benefit from these trends. However, the semiconductor industry's cyclicality and potential slowdown in smartphone SoC shipments could temper overall demand growth.

## Full text (English translation)

SEMI: Q2 2026 Global Silicon Wafer Shipments Up 7.4% YoY
- Q2 smartphone memory prices up over 80% QoQ, DRAM surpasses SoC as most expensive component
- H1 2026 global smartphone SoC shipments down 15%
- Institution: Nvidia and Broadcom CPO enter mass production, three key bottlenecks
- AI servers continue to squeeze supply! BofA raises DRAM price forecast again: Q3 contract prices may rise 30-40%

SEMI: Q2 2026 Global Silicon Wafer Shipments Up 7.4% YoY
On July 29, the quarterly silicon wafer industry analysis report released by SEMI's Silicon Manufacturers Group (SMG) showed that global silicon wafer shipments in Q2 2026 increased 7.4% year-over-year to 3,573 million square inches (MSI), compared to 3,327 MSI in the same period of 2025. Shipments increased 9.1% sequentially from the 3,275 MSI recorded in Q1 2026.
Silicon wafers are the fundamental material for most semiconductor products, and semiconductors are indispensable core components of all electronic devices. These highly engineered thin discs, with diameters up to 300mm, are the substrate material used in the vast majority of semiconductor manufacturing.

- Q2 smartphone memory prices up over 80% QoQ, DRAM surpasses SoC as most expensive component
Counterpoint Research's latest data shows that smartphone memory prices rose over 80% quarter-over-quarter in Q2 2026, leading to significant increases in BOM costs across all price segments.
Compared to the same period in 2025, low-end models with the same configuration saw BOM costs increase 70% year-over-year, with almost all growth driven by storage; mid-end models saw BOM costs increase 52%, with memory accounting for 40% of total BOM cost; flagship models saw BOM costs increase nearly 50%. Additionally, DRAM has surpassed SoC to become the most expensive single component in flagship smartphones. It is estimated that the 1TB iPhone 18 Pro Max costs nearly $300 more than the iPhone 17 Pro Max with the same capacity from last year.
The report also noted that the introduction of future 2nm flagship SoCs will further increase flagship BOM costs, and even if OEMs raise prices, overall gross margins are expected to be slightly lower than those of the same-generation flagship products in 2025.

3. H1 2026 global smartphone SoC shipments down 15%
On July 29, market research firm Counterpoint Research reported in a report that due to factors such as rising memory costs, cautious inventory management by smartphone OEMs, and longer replacement cycles, global smartphone SoC shipments in H1 2026 decreased 15% year-over-year.
In H1 2026, MediaTek and Qualcomm chip shipments decreased over 25% year-over-year. Meanwhile, Apple, Samsung, Google, and UNISOC all achieved robust growth in chip shipments during this period.
Senior analyst Shivani Parashar commented on smartphone SoC vendor dynamics: "Many entry-level smartphone models are migrating to UNISOC's 4G platforms to reduce BOM costs, which will help UNISOC achieve growth in H1 2026. In addition, UNISOC has made significant progress in 5G applications through partnerships with Pocophone and Redmi."
Counterpoint Research expects global smartphone SoC shipments to decline 14% year-over-year in 2026. The entry-level market will be most affected, with shipments possibly declining over 30% this year.

4. Institution: Nvidia and Broadcom CPO enter mass production, three key bottlenecks
TrendForce stated that as Nvidia ships its new Spectrum-X CPO switches to some partners and Broadcom's 51.2T Bailly CPO switch continues small-volume shipments, co-packaged optics (CPO) has officially entered the mass production stage. However, the supply capacity of core components such as optical engines, silicon photonics chips, and advanced packaging will be key factors affecting the expansion speed of CPO switches.
TrendForce stated that the Spectrum-X CPO switch is developed by Nvidia in cooperation with TSMC, using COUPE advanced packaging process, with processing capacity of 400 Tb/s, and production capacity will further expand in H2 2026. Broadcom's 51.2T Bailly CPO switch is being brought to mass production with the help of partners Delta Electronics and Micas Networks, and can reduce power consumption by up to 70% compared to traditional pluggable optical transceiver modules. Hyperscalers such as Meta have completed deployment validation.
CPO integrates optical components around the switch ASIC to achieve lower power consumption, becoming the core development direction for next-generation high-bandwidth switches. However, according to TrendForce's observation, CPO switches face three supply bottlenecks. First, optical engines must integrate lasers, modulators, and other components, with complex processes and high yield requirements, plus thermal management issues, only a few suppliers have mass production capabilities.
Second, because silicon photonics wafer foundry and back-end packaging require high precision and reliability, capacity construction cycles are long, and short-term supply elasticity is insufficient. In addition, CPO switches have significantly increased dependence on advanced packaging processes such as COUPE, but AI chips and high-performance computing (HPC) are also competing for similar packaging capacity, causing continuous compression of CPO supply chain resources.
Facing supply chain pressure, leading manufacturers' response strategies show clear divergence. Some cloud giants lock in supply through long-term procurement agreements and strategically invest in upstream silicon photonics companies. Nvidia has deepened cooperation with TSMC, which has advanced packaging capacity, achieving vertical integration. Companies like Google are accelerating self-development of optical components to reduce dependence on external suppliers.
TrendForce expects vertical integration to become the new normal, and companies that can independently master silicon photonics design, optical engine manufacturing, and advanced packaging resources will gain a leading advantage in the CPO switch market volume growth cycle from 2027 to 2028.

5. AI servers continue to squeeze supply! BofA raises DRAM price forecast again: Q3 contract prices may rise 30-40%
According to the latest channel survey from Bank of America Global Research in late July, the intensity of memory price increases is seeping from "spot pulse" into "quarterly contracts". More second-tier OEMs and module makers have accepted July PC DRAM contract prices rising another 15-20% from June. DRAM in Q3 is expected to directly double, with average selling price increases possibly reaching 30-40%, significantly higher than TrendForce's earlier forecast of 13-18%.
The highlight this round is not spot quotes, but downstream writing higher prices into procurement budgets. According to BofA's survey, 16Gb DDR5 spot is about $50, DDR4 spot is about $80 (non-public market average); 64GB server module contracts exceed $1000, with DDR5 version about $1400.
Price increases are simultaneously reflected from PC, servers to high-end DRAM, mainly because HBM and high-capacity server DRAM continue to absorb wafer capacity, squeezing out ordinary PC DRAM and some DDR4.
Google parent Alphabet's Q2 cloud revenue increased 82% year-over-year, with backlog orders of $514 billion. The company raised its 2026 capital expenditure guidance from $180-190 billion to $195-205 billion, and reiterated a "significant increase" in 2027. BofA's model estimates this year's capex at about $199.5 billion.
According to BofA's assumptions above, storage procurement volume in 2027 may increase at least 50% year-over-year, which explains why Samsung, SK Hynix, and Micron are highly sensitive to cloud vendors' capex expectations.
According to Korea Customs Service data, the country's exports in the first 20 days of July were $54.9 billion, up 52.3% year-over-year, of which semiconductor exports were $22.1 billion, up 80.6% year-over-year, accounting for 40.3%.
Samsung Electronics is expected to hold its Q2 earnings conference call on July 30, and the market is watching whether it will announce a large-scale buyback or pay out part of 2026 dividends early.
For the memory sector, price increases are fundamentals, AI capex is demand support, and buybacks/dividends are sentiment boosters. The combination of these three raises attention, but cannot replace order and profit margin realization.
BofA believes the sustainability of DRAM price increases depends on two major aspects: First, Google's nearly $300 billion capex in 2027 is BofA's estimate. If cloud vendors slow down data center construction, procurement pace will be lengthened. Second, DRAM average price growth rate will slow from 53% in Q2 to 21% in Q3 and 7% in Q4, with increases declining quarter by quarter. In the context of Korean stocks' "strong fundamentals, high leverage volatility", contract prices exceeding expectations are profit elasticity for manufacturers, but not an immunity charm for valuation.

## Full text (original)

- 
SEMI：2026年Q2全球硅晶圆出货量同比增长7.4% 
- 
Q2智能手机内存价格环比上涨超80%，DRAM超SoC成最贵元器件 
- 
2026年上半年全球智能手机SoC出货量下降15% 
- 
机构：英伟达、博通CPO开始量产，三关键成瓶颈 
- 
AI服务器持续挤压供给！美银再上修DRAM涨价预期：Q3合约价恐涨30-40% 
- 
SEMI：2026年Q2全球硅晶圆出货量同比增长7.4% 
7月29日，SEMI旗下Silicon Manufacturers Group (SMG)发布的硅片行业季度分析报告显示，2026年第二季度全球硅晶圆出货量同比增长7.4%，达到3573百万平方英寸（MSI），2025年同期为3327百万平方英寸。出货量较2026年第一季度记录的3275百万平方英寸环比增长9.1%。
硅晶圆是多数半导体产品的基础材料，而半导体则是所有电子装置不可或缺的核心组件。这些高度工程化的薄型圆片，直径最大可达300mm，是绝大多数半导体制造所使用的基板材料。
- Q2智能手机内存价格环比上涨超80%，DRAM超SoC成最贵元器件
Counterpoint Research最新数据显示，2026年第二季度智能手机内存价格环比上涨超80%，导致各价位段机型BOM成本显著上升。
与2025年同期相比，相同配置的低端机型BOM成本同比增长70%，几乎所有增长均由存储驱动；中端机型BOM成本增长52%，内存占总BOM成本的40%；旗舰机型BOM成本增长近50%。此外，DRAM已超越SoC成为旗舰智能手机中最昂贵的单一元器件。据估算，1TB版iPhone 18 Pro Max相比去年同容量的iPhone 17 Pro Max成本上涨近300美元。
报告还指出，未来2nm旗舰SoC的导入将进一步推高旗舰机型BOM成本，即便OEM上调售价，整体毛利率预计仍将略低于2025年同代旗舰产品水平。
3. 2026年上半年全球智能手机SoC出货量下降15%
7月29日，市调机构Counterpoint Research在报告中指出，受内存成本上升、智能手机OEM厂商谨慎的库存管理以及更长的更换周期等因素影响，2026年上半年全球智能手机SoC出货量同比下降15%。
2026年上半年，联发科和高通的芯片出货量同比下降超过25%。与此同时，苹果、三星、谷歌和紫光展锐在此期间的芯片出货量均实现了稳健增长。
该机构高级分析师Shivani Parashar在评论智能手机SoC厂商动态时表示：“许多入门级智能手机机型正在向紫光展锐的4G平台迁移，以降低物料清单成本，这将有助于紫光展锐在2026年上半年实现增长。此外，紫光展锐通过与Pocophone和Redmi的合作，在5G应用方面取得了显著进展。”
Counterpoint Research预计2026年全球智能手机SoC出货量将同比下降14%。入门级市场受影响最大，今年出货量可能同比下降超过30%。
4. 机构：英伟达、博通CPO开始量产，三关键成瓶颈
TrendForce表示，随着英伟达出货新一代Spectrum-X CPO交换器给部分合作伙伴、博通的51.2T Bailly CPO交换器持续小量出货，象征共同封装光学(CPO)正式迈入量产阶段。然而，光引擎、硅光子芯片、先进封装等核心元件的供给能力，将成为影响CPO交换器扩产速度的关键因素。
TrendForce表示，Spectrum-X CPO交换器由英伟达与台积电合作开发，采用COUPE先进封装制程，处理能力达400 Tb/s，2026下半年产能将进一步扩大。博通51.2T Bailly CPO交换器由合作伙伴台达电、Micas Networks协助导入量产，较传统可插拔光收发模组可降低功耗达70%，已有Meta等超大规模厂商完成部署验证。
CPO整合光学元件至交换器ASIC周边，达到降低功耗的效果，成为下一代高频宽交换器的核心发展方向。但据TrendForce观察，CPO交换器正面临三项供给瓶颈。首先，光引擎须整合雷射、调变器等元件，制程复杂、对良率要求高，加上热管理问题，仅有少数供应商具备量产能力。
其次，由于硅光子晶圆代工、后段封装对精度与可靠度要求高，产能建置周期较长，短期内供给弹性不足。此外，CPO交换器对COUPE等先进封装制程依赖程度大幅提升，但AI芯片、高性能计算(HPC)也在竞争同类封装产能，导致CPO供应链资源持续受到压缩。
面对供应链压力，领先厂商的应对策略呈现明显分化。部分云端巨头透过长期采购协议锁定供给，并战略投资上游硅光子厂商。英伟达与掌握先进封装产能的台积电深化合作，达成垂直整合。Google等厂商则加速自研光学元件，以降低对外部供应商的依赖。
TrendForce预期，垂直整合将成为新常态，能自主掌握硅光子设计、光引擎制造与先进封装资源的厂商，将能在2027至2028年CPO交换器市场放量周期中取得领先优势。
5. AI服务器持续挤压供给！美银再上修DRAM涨价预期：Q3合约价恐涨30-40%
根据美银全球研究部7月下旬最新渠道调查，存储涨价强度正从“现货脉冲”渗入“季度合约”，更多二线OEM与模组厂已接受7月PC DRAM合约价较6月再涨15-20%，第三季DRAM预计将直接翻倍，平均售价涨幅恐达30-40%，明显高于TrendForce此前给出的13-18%预测。
本轮看点不在现货报价，而在下游把更高价格写进采购预算。根据美银调查，16Gb DDR5现货约50美元，DDR4现货约80美元 (非公开行情均值)；64GB服务器模组合约破1000美元，DDR5版本约1400美元。
涨价从PC、服务器到高端DRAM同步体现，主要因为HBM、高容量服务器DRAM持续吸走晶圆产能，普通PC DRAM与部分DDR4被挤出。
谷歌母公司Alphabet今年Q2云端营收年增82%、积压订单5140亿美元，公司将2026年资本支出指引由1800-1900亿美元上调至1950-2050亿美元，并重申 2027年“大幅增加”，美银模型更估计今年资本资出约1995亿美元。
按照美银上述假设，2027年存储采购量恐年增至少50%，这也解释了为何三星、SK海力士、美光对云端厂商资本支出预期高度敏感。
根据韩国海关数据，该国7月前20天出口额549亿美元，年增52.3%，其中半导体出口额221亿美元，年增 80.6%，占比达40.3%。
三星电子预计7月30日将召开Q2财报电话会议，市场关注是否宣布大规模回购，或提前发放2026年部分股利。
对存储族群而言，涨价是基本面、AI资本支出是需求支撑、回购分红是情绪加分，三者叠加提高关注度，但不能取代订单与利润率兑现。
美银认为，DRAM涨价持续性看两大方面；一，谷歌2027年近3000亿资本支出是美银估算，若云端厂商放缓数据中心建设，采购节奏将被拉长；二，DRAM均价Q2涨速将从53%，Q3降至21%，Q4变为7%，涨幅逐季下降，而在韩股“强基本面、高槓杆波动”的背景下，合约价超预期是厂商获利弹性，却非估价的免疫符。
