# China's 2026 Data Center PUE Policies Tighten Across All 34 Provinces: New Large Facilities Must Achieve ≤1.3, with Fines and Subsidies for Compliance

- Source: China IDC Circle (T2)
- Published: 2026-07-27
- Score: 50.2
- Tags: Policy / standards, Datacenter
- Companies: GDS
- Original: https://news.idcquan.com/news/207645.shtml

## Intelligence brief

### What happened On July 27, 2026, China's IDC Circle published a comprehensive summary of data center Power Usage Effectiveness (PUE) policies across all 34 provincial-level administrative regions (including provinces, autonomous regions, municipalities, and special administrative regions) for 2026. The policies cover new project, existing facility retrofits, and reward-penalty mechanisms, reflecting the deepening of the "East Data West Computing" strategy. Key measures include differential electricity pricing, subsidies for low-PUE projects, and mandatory closure of inefficient facilities. ### Key figures - **Beijing**: PUE >1.35 triggers surcharge of 0.2 yuan/kWh (1.35-1.7) or 0.5 yuan/kWh (>1.7); target average PUE <1.35 by 2027; green power ratio requirement inversely scales with PUE (20% for ≤1.2, 30% for 1.2-1.35, 40% for >1.35); retrofit subsidies up to 30 million yuan. - **Shanghai**: New data centers target PUE ≤1.25; AI computing centers hard limit at 1.25. - **Tianjin**: Large new data centers PUE ≤1.3, small/medium ≤1.5; Beijing-Tianjin-Hebei hub projects ≤1.25; existing PUE >1.5 must retrofit to <1.4 by end-2026; subsidy of 500 yuan/rack for new PUE ≤1.2, 10% of investment for retrofits (max 10 million yuan). - **Chongqing**: Chengdu-Chongqing hub new projects PUE ≤1.25; other areas large ≤1.3, small/medium ≤1.5; additional subsidies for PUE ≤1.2 and green power ≥50%. - **Hebei**: All large/ultra-large data centers with PUE >1.3 shut down by end-2025; new projects prioritize renewable energy ≥50%; Beijing-Tianjin-Hebei hub projects PUE ≤1.25; subsidy 8% of investment for PUE ≤1.2 (max 5 million yuan). - **Shanxi**: New data centers PUE ≤1.3; existing retrofit to <1.4 by end-2026; subsidy up to 1,000 yuan/rack for annual PUE <1.18 (max 5 million yuan per enterprise). - **Inner Mongolia**: Hub new projects PUE ≤1.2; PUE ≤1.15 priority for carbon trading; target 100% green power. - **Liaoning**: New data centers PUE ≤1.3; existing retrofit to <1.5 by end-2026; subsidies for PUE ≤1.25 in western Liaoning. - **Jilin**: Large new data centers PUE ≤1.25, small/medium ≤1.4; existing PUE >1.5 retrofit to <1.4 by end-2026; subsidy 0.03 yuan/kWh for 3 years for PUE ≤1.2. - **Heilongjiang**: Large new data centers target PUE <1.25; PUE ≤1.2 projects get land/energy priority. - **Jiangsu**: Large new data centers PUE <1.3, green rating 4A+; small/medium ≤1.5; existing large PUE >1.4 retrofit to <1.35 by end-2026; subsidy 800 yuan/rack for PUE ≤1.2 (max 20 million yuan). - **Zhejiang**: Average PUE ≤1.4; large new ≤1.3, Yangtze River Delta hub ≤1.25; existing PUE >1.5 retrofit by June 2026; PUE ≤1.2 discount 0.05 yuan/kWh; PUE >1.6 surcharge 0.3 yuan/kWh. - **Anhui (Wuhu cluster)**: New projects ≥3,000 racks, utilization ≥65%, PUE <1.25; surcharge 0.11 yuan/kWh for PUE 1.4-1.8, 0.5 yuan/kWh for >1.8; subsidy 10% of investment for PUE ≤1.2 (max 15 million yuan). - **Fujian**: Average PUE <1.35 by 2026; large new ≤1.3, small/medium ≤1.5; national computing network projects ≤1.25. - **Jiangxi**: New/expanded data centers PUE ≤1.25; average PUE <1.5; existing PUE >1.5 retrofit by end-2026. - **Shandong**: Large new data centers design PUE ≤1.3; existing large target PUE <1.4 by end-2026; target 100 million kWh electricity savings. - **Henan**: Large new PUE ≤1.3, small/medium ≤1.5; national network projects ≤1.25; existing PUE >1.5 retrofit to <1.4 by end-2026; subsidy 0.04 yuan/kWh for 2 years for PUE ≤1.2. - **Hubei**: Large new PUE ≤1.3; Chengdu-Chongqing hub projects ≤1.25; subsidy 8% of investment for PUE ≤1.2 (max 10 million yuan). - **Hunan**: AI computing projects (≥50 PFlops, PUE ≤1.3) get 10% subsidy on equipment/software (max 20 million yuan); large new ≤1.3, small/medium ≤1.5; average PUE <1.35 by end-2026. - **Guangdong**: National hub new projects average PUE ≤1.25; other areas ≤1.3; existing retrofit to ≤1.5 by end-2026; subsidy 600 yuan/rack for PUE ≤1.2; surcharge 0.4 yuan/kWh for PUE >1.6. - **Guangxi**: Large/ultra-large average PUE <1.3; others ≤1.5; existing PUE >1.5 retrofit by end-2026. - **Hainan**: Large new PUE ≤1.3, small/medium ≤1.5; UDC PUE <1.1; green power ≥60%; subsidy 15% of investment for PUE ≤1.2 and green ≥80% (max 30 million yuan). - **Sichuan (Tianfu cluster)**: Cluster new large/ultra-large PUE <1.25 (subsidy 20 million yuan), <1.15 (30 million yuan); 2026 target: 500,000 racks, utilization 60%, average PUE ≤1.3; cluster startup area 300,000 racks, utilization 70%, PUE ≤1.25, renewable energy 85%. - **Guizhou (Gui'an cluster)**: Average PUE 1.19 by 2026; computing power target 190 EFLOPS; "computing voucher" policy increased to 140 million yuan; key projects PUE <1.15. - **Yunnan**: Large new data centers green rating 4A+, PUE ≤1.3; existing PUE >1.5 retrofit by end-2026; PUE ≤1.2 priority for green power and tariff discounts. - **Tibet**: Large new PUE ≤1.2, small/medium ≤1.4; green power ≥90%; PUE ≤1.15 full tax exemption; existing PUE >1.5 retrofit to <1.4 by end-2026. - **Shaanxi**: Large new PUE ≤1.25, small/medium ≤1.4; national network projects ≤1.2; existing PUE >1.5 retrofit to <1.4 by end-2026; subsidy 10% of investment for PUE ≤1.2 (max 20 million yuan). - **Gansu (Qingyang cluster)**: New large/ultra-large PUE ≤1.20, ≥3,000 racks, average power ≥8kW, grade A; post-operation PUE ≤1.20, utilization ≥65% within 1 year. - **Qinghai**: New large/ultra-large PUE <1.2, clean energy 100% traceable; existing PUE >1.5 phased out by end-2026. - **Ningxia**: Large new PUE ≤1.2, small/medium ≤1.4; green power ≥80%; subsidy 1,000 yuan/rack for PUE ≤1.15 (max 20 million yuan); existing PUE >1.5 retrofit to ≤1.2 by end-2026 (subsidy 8% of investment). - **Xinjiang**: Existing data centers PUE 1.08-1.15; new large PUE ≤1.2, small/medium ≤1.4; target 100% renewable energy. - **Hong Kong**: New data centers PUE ≤1.3, large (≥1,000 racks) ≤1.25; ban on new PUE >1.35; existing PUE >1.5 retrofit to <1.4 by end-2026; subsidy 0.1 HKD/kWh for 3 years for PUE ≤1.2. - **Macau**: New data centers PUE ≤1.35, small/medium ≤1.5; PUE ≤1.25 eligible for government funding; subsidy 5% of investment for PUE ≤1.3 and green ≥50%; existing PUE >1.6 retrofit to <1.5 by end-2026. - **Taiwan**: Large new PUE ≤1.3, small/medium ≤1.5; "Digital Taiwan" projects ≤1.25; existing PUE >1.5 retrofit to <1.4 by end-2026; corporate tax reduction of 5 percentage points for PUE ≤1.2. ### Why it matters to ebm-papst China's increasingly stringent PUE regulations across all regions create significant demand for high-efficiency fans and motors, which are critical for cooling systems in data centers. ebm-papst's product portfolio, including EC fans and energy-efficient motors, directly addresses the need to lower PUE. The policies' emphasis on liquid cooling, natural cooling, and AI-driven energy management signals opportunities for ebm-papst to supply components for advanced thermal management solutions. The regional differentiation—with eastern regions focusing on retrofits and western regions on new low-PUE facilities—implies diverse market needs. Assessment (inference): The tightening PUE thresholds, especially in hubs like Beijing (1.35), Shanghai (1.25), and western regions (1.2 or below), will accelerate the replacement of legacy cooling equipment. ebm-papst should target both retrofit projects (e.g., in Beijing, Tianjin, Zhejiang) and new builds in western hubs (e.g., Inner Mongolia, Ningxia, Xinjiang) where low PUE is mandated. The subsidies for PUE ≤1.2 projects provide financial incentives for operators to invest in premium efficiency components. Additionally, the green power requirements may drive demand for integrated solutions combining efficient fans with renewable energy systems. ebm-papst's competitors in the fan and motor space will also benefit, but the company's strong brand and proven efficiency could be a differentiator. It is recommended to engage with major Chinese data center operators and system integrators to promote ebm-papst products as part of compliant cooling architectures.

## Full text (English translation)

With the deepening of the 'East Data West Computing' strategy, data centers, as core infrastructure of the digital economy, have their Power Usage Effectiveness (PUE) become a key assessment indicator for green and low-carbon development. In 2026, all 34 provincial-level administrative regions (provinces, autonomous regions, municipalities, and special administrative regions) in China have clarified PUE control requirements for data centers, covering core content such as new project access, existing project retrofits, and reward-penalty mechanisms. The following is the most complete and specific policy summary on the internet, suitable for enterprise implementation, industry research, and other needs.

2026 Data Center PUE Policies by Region

01 Beijing
Starting from 2026, Beijing imposes differential electricity pricing on data centers with PUE exceeding 1.35. For exceeding the limit by less than 1x (PUE 1.35-1.7), a surcharge of 0.2 yuan/kWh; for exceeding by more than 1x (PUE >1.7), a surcharge of 0.5 yuan/kWh.
Target: by 2027, the city's average annual PUE to drop below 1.35, and all existing projects must meet the standard.
Regarding green electricity, the lower the PUE, the looser the green electricity ratio requirement: PUE ≤1.2 targets 20% green electricity, 1.2-1.35 targets 30%, and above 1.35 requires 40%.
Energy-saving renovation projects can receive up to 30 million yuan in rewards, with energy-saving subsidies up to 1,200 yuan per ton of standard coal; other green projects receive 30% of investment amount as subsidy. At the same time, compliant data centers will be publicly listed, encouraging efficient projects to integrate inefficient facilities and take over business migration.

02 Shanghai
In 2026, new data centers aim to control PUE at 1.25, with AI computing centers having a hard threshold of 1.25.
Future new projects may be stricter than 1.25, and consideration is being given to following up with differential electricity pricing and expanding carbon trading coverage.
Liquid cooling, green electricity trading + green certificates are the main technical paths. WanGuo Data's Pujiang center and Wangsu's Jiading park have already stabilized at PUE below 1.26.

03 Tianjin
Large new data centers: PUE ≤1.3; small/medium ≤1.5; projects included in the Beijing-Tianjin-Hebei hub node must be ≤1.25.
By the end of 2026, all existing projects with PUE >1.5 must complete retrofits, targeting a reduction to below 1.4, otherwise capacity expansion is restricted.
New data centers with PUE ≤1.2 receive a subsidy of 500 yuan per rack; existing projects that reduce PUE by more than 0.2 after retrofit receive a subsidy of 10% of total investment, capped at 10 million yuan.

04 Chongqing
New data centers within the Chengdu-Chongqing hub node: PUE ≤1.25; large projects in other areas ≤1.3; small/medium ≤1.5.
Benchmark projects must achieve national standard Grade 1 energy efficiency.
Encouraged to coordinate with new energy enterprises in 'source-grid-load-storage' synergy; projects with PUE ≤1.2 and green electricity consumption not less than 50% can receive additional subsidies.

05 Hebei (including Xiong'an New Area)
By the end of 2025, all large and ultra-large existing data centers with PUE >1.3 have been shut down and withdrawn; in 2026, consolidate achievements and strictly prohibit restart. New projects prioritize support for those with renewable energy supply ratio reaching 50% or more; projects included in the Beijing-Tianjin-Hebei hub node have PUE ≤1.25; large projects in other areas ≤1.3.
New projects using indirect evaporative cooling, liquid cooling, etc., with PUE ≤1.2, receive a subsidy of 8% of investment amount, capped at 5 million yuan.

06 Shanxi
In 2026, new data centers: PUE ≤1.3; existing projects must reduce to below 1.4 after retrofit, with all low-efficiency project retrofits completed by the end of 2026.
Data centers with annual average PUE below 1.18 for the first time receive a subsidy of up to 1,000 yuan per physical rack, with a single enterprise cap of 5 million yuan. Projects with PUE ≤1.2 and green electricity consumption ratio ≥60% receive additional subsidy preference.

07 Inner Mongolia
New data centers in hub nodes such as Hohhot and Jining strictly control PUE below 1.2, promoting natural cooling.
Data centers with PUE ≤1.15 have priority to participate in carbon trading revenue distribution; leveraging green electricity advantages to promote 100% green electricity use in data centers.

08 Liaoning
In 2026, new data centers: PUE ≤1.3; key layout in Shenyang, Dalian 'dual core' and western Liaoning growth pole; new projects must simultaneously support energy-saving facilities.
Existing projects must reduce PUE to below 1.5 after retrofit, completed by the end of 2026; AI energy-saving automatic control and waste heat recovery are encouraged.
Projects in western Liaoning with PUE ≤1.25 enjoy land and electricity price preferential policies.

09 Jilin
Large new data centers: PUE ≤1.25; small/medium ≤1.4.
By the end of 2026, existing projects with PUE >1.5 must reduce to below 1.4 after retrofit; non-compliant ones suspend operation.
Data centers with PUE ≤1.2 receive a subsidy of 0.03 yuan per kWh for 3 consecutive years; coordination with new energy projects is encouraged.

10 Heilongjiang
In 2026, strive to reduce PUE of large new data centers to below 1.25; leverage wind and solar resources to promote computing-electricity synergy. Existing projects continue to promote technologies such as indirect evaporative cooling and AI energy-saving automatic control.
Cities like Harbin and Daqing have priority layout; projects with PUE ≤1.2 can receive land and energy index preference.

11 Jiangsu
New large and above data centers must meet green data center standards, with PUE <1.3 and green low-carbon rating 4A or above; small/medium PUE not higher than 1.5.
By the end of 2026, large existing projects with PUE >1.4 must reduce to below 1.35 after retrofit. New data centers with PUE ≤1.2 receive a subsidy of 800 yuan per rack, with a single project cap of 20 million yuan.

12 Zhejiang
In 2026, the province's general data centers PUE not higher than 1.5, average not higher than 1.4; new large and above PUE not higher than 1.3; Yangtze River Delta hub node projects ≤1.25.
Existing projects with PUE >1.5 must complete retrofits by the end of June 2026, otherwise power is limited. PUE ≤1.2 enjoys a discount of 0.05 yuan per kWh; PUE >1.6 surcharge of 0.3 yuan per kWh. Data centers are encouraged to participate in virtual power plant peak shaving.

13 Anhui (including Wuhu cluster)
Wuhu cluster: new projects scale not less than 3,000 standard racks, utilization rate not less than 65%, PUE <1.25.
PUE >1.4 and ≤1.8 surcharge 0.11 yuan/kWh; >1.8 surcharge 0.5 yuan/kWh. Other areas in the province: new large projects PUE ≤1.3, small/medium ≤1.5; by the end of 2026, the province's average PUE drops below 1.35.
New projects with PUE ≤1.2 receive subsidy of 10% of investment amount, capped at 15 million yuan; existing projects that reduce PUE by more than 0.3 after retrofit receive a one-time subsidy of 5 million yuan.

14 Fujian
By 2026, the province's average data center PUE below 1.35. New large projects PUE ≤1.3, small/medium ≤1.5; projects included in the national integrated computing network must be ≤1.25.
Key reliance on Digital Fujian (Changle, Anxi) industrial parks, promoting liquid cooling and waste heat recovery, exploring green electricity direct supply and digital-electricity joint operation.

15 Jiangxi
In 2026, new and expanded data centers generally PUE not exceeding 1.25, priority support for projects with high green electricity proportion.
Provincial average PUE drops below 1.5, utilization rate above 60%. By the end of 2026, complete retrofit of existing projects with PUE >1.5; encourage liquid cooling, new energy storage; support increasing green electricity consumption ratio through green certificate and green electricity trading.

16 Shandong
In 2026, new large and above data centers design PUE not higher than 1.3; encourage immersion liquid cooling and indirect evaporative cooling.
By the end of 2026, the province's large and above existing projects strive to reduce measured PUE to below 1.4. Support application of high-voltage DC power supply, modular UPS, variable frequency refrigeration, waste heat utilization, etc., striving to save over 100 million kWh of electricity annually.

17 Henan
New large projects PUE ≤1.3, small/medium ≤1.5; projects included in the national integrated computing network PUE ≤1.25, priority layout in Zhengzhou and Luoyang.
By the end of 2026, existing projects with PUE >1.5 must reduce to below 1.4 after retrofit, otherwise capacity expansion is not approved.
PUE ≤1.2 subsidy 0.04 yuan/kWh for 2 consecutive years; additional subsidy for green electricity proportion ≥50%.

18 Hubei
Encourage all regions to promote coordination between data centers and new energy enterprises in 'source-grid-load-storage' synergy, forming a computing-electricity integrated energy supply system.
New large projects PUE ≤1.3; projects related to Chengdu-Chongqing hub ≤1.25. Support Yichang and Shiyan to build green computing centers; key projects with PUE ≤1.2 receive subsidy of 8% of investment amount, capped at 10 million yuan.

19 Hunan
New (retrofit) intelligent computing infrastructure projects with total computing power above 50 PFlops and PUE not higher than 1.3 receive a subsidy of 10% of equipment and software costs, capped at 20 million yuan.
New large projects PUE ≤1.3, small/medium ≤1.5; by the end of 2026, provincial average PUE drops below 1.35. Projects with PUE ≤1.2 are prioritized for inclusion in the provincial green data center directory, enjoying tax incentives.

20 Guangdong
Within national hub nodes, new projects average PUE not exceeding 1.25; other areas in the province not exceeding 1.3.
Existing projects must complete retrofits with PUE not higher than 1.5, all compliant by the end of 2026. PUE ≤1.2 subsidy 600 yuan per rack; PUE >1.6 surcharge 0.4 yuan/kWh; green electricity proportion ≥70% additional subsidy.

21 Guangxi
By 2026, large and ultra-large data centers average PUE below 1.3; other types not exceeding 1.5.
Complete retrofit of projects with PUE exceeding 1.5 by the end of 2026. Promote liquid cooling and waste heat recovery; prioritize support for new and expansion projects with high green electricity proportion; build 'one-hop direct' direct connection network.

22 Hainan
New large projects PUE ≤1.3, small/medium ≤1.5. Submarine data centers (UDC) leverage ocean cooling advantages, with PUE controlled below 1.1.
Data center green electricity consumption ratio not less than 60%; projects with PUE ≤1.2 and green electricity ratio ≥80% receive subsidy of 15% of investment amount, capped at 30 million yuan. Promote submarine data centers to connect to the national computing internet.

23 Sichuan (including Tianfu cluster)
Within Tianfu cluster, new large and ultra-large data centers PUE <1.25 receive a one-time reward of 20 million yuan; PUE <1.15 reward 30 million yuan. In 2026, the province's rack scale reaches 500,000, utilization rate 60%, average PUE not higher than 1.3; cluster startup area racks 300,000, utilization rate 70%, PUE not higher than 1.25, renewable energy usage rate 85%. Areas outside the cluster with average utilization rate below 60% and average PUE not reaching 1.3 shall generally not build new data centers.

24 Guizhou (including Gui'an cluster)
In 2026, the province's average data center PUE drops to 1.19, reaching national standard Grade 1 energy efficiency. Computing power scale target 190 EFLOPS; 'computing voucher' policy support increased to 140 million yuan.
Key projects PUE controlled below 1.15. Province-wide new large projects PUE ≤1.25; intelligent computing proportion has exceeded 97%; promote intelligent building platforms, liquid cooling, and other technologies.

25 Yunnan
In 2026, new large and above data centers green rating 4A or above, PUE reaching 1.3 or below. Complete retrofit of existing projects with PUE exceeding 1.5 by the end of 2026.
Projects with PUE ≤1.2 have priority access to green electricity direct supply and electricity price discounts.

26 Tibet
New large data centers PUE ≤1.2, small/medium ≤1.4; leverage plateau low-temperature advantages to promote natural cooling.
Green electricity consumption ratio not less than 90%; projects with PUE ≤1.15 can enjoy full tax exemption.
Complete retrofit of existing projects with PUE >1.5 by the end of 2026; after retrofit, must reduce to below 1.4.

27 Shaanxi
New large projects PUE ≤1.25, small/medium ≤1.4; national integrated computing network projects must be ≤1.2, priority layout in Xi'an and Yulin.
By the end of 2026, existing projects with PUE >1.5 must reduce to below 1.4 after retrofit, otherwise power cut and rectification. PUE ≤1.2 receives subsidy of 10% of investment amount, capped at 20 million yuan.

28 Gansu (including Qingyang cluster)
Qingyang cluster: from 2026, new large and ultra-large data centers PUE ≤1.20, single project scale not less than 3,000 standard racks, average power ≥8kW, grade national standard A.
After operation, comprehensive PUE must be ≤1.20, utilization rate ≥65% within 1 year.
Other areas in the province: new large projects PUE ≤1.3, small/medium ≤1.5; encourage green rating G4 or above.

29 Qinghai
New (expanded) large and above data centers PUE strictly controlled below 1.2, clean energy utilization rate 100% and traceable.
By the end of 2026, complete withdrawal of functionally backward data centers with annual average PUE >1.5; strictly prohibit expansion of low-efficiency projects.
Issue green computing certification rules, strengthen full-process PUE control.

30 Ningxia
New large data centers PUE ≤1.2, small/medium ≤1.4; leveraging photovoltaic and wind power advantages, green electricity consumption ratio ≥80%.
New projects with PUE ≤1.15 receive subsidy of 1,000 yuan per rack, single project cap 20 million yuan.
By the end of 2026, complete retrofit of existing projects with PUE >1.5; after retrofit, PUE ≤1.2 receives subsidy of 8% of investment amount.

31 Xinjiang
Leveraging low-temperature climate and green electricity resources, existing data centers generally have PUE between 1.08-1.15; benchmark projects in Karamay and Changji have reached 1.13, 1.08, 1.15.
In 2026, new large projects PUE ≤1.2, small/medium ≤1.4; prioritize support for green electricity direct supply, promote 100% renewable energy. Key layout in Karamay and Changji, undertaking high-energy computing from the east.

32 Hong Kong
New data centers PUE ≤1.3; large projects (racks ≥1,000) ≤1.25; ban on new PUE >1.35.
By the end of 2026, complete retrofit of existing projects with PUE >1.5; after retrofit, must reduce to below 1.4, otherwise operating license not renewed.
PUE ≤1.2 electricity subsidy 0.1 HKD/kWh for 3 consecutive years.

33 Macau
New data centers PUE ≤1.35, small/medium ≤1.5; projects serving digital government and cultural tourism have priority; PUE ≤1.25 can receive government funding support. PUE ≤1.3 and green electricity consumption ≥50% receive subsidy of 5% of investment amount.
By the end of 2026, complete retrofit of existing projects with PUE >1.6; after retrofit, must reduce to below 1.5.

34 Taiwan
New large data centers PUE ≤1.3, small/medium ≤1.5; 'Digital Taiwan' key projects must be ≤1.25.
By the end of 2026, complete retrofit of existing projects with PUE >1.5; after retrofit, must reduce to below 1.4.
PUE ≤1.2 corporate income tax reduced by 5 percentage points; encourage coordination with new energy projects.

2026 PUE Policy Core Trends
1. Thresholds universally tightened: New large data centers generally require PUE below 1.3, hub node projects mostly tightened to 1.25, some western advantageous regions already compressed to below 1.2; Shanghai is considering further tightening.
2. Two-way reward and punishment: Differential electricity pricing, punitive electricity pricing, power limitation and withdrawal, along with financial subsidies and tax reductions, implemented in parallel; Beijing and Wuhu have issued clear surcharge details.
3. Technical routes clarified: Liquid cooling, natural cooling, waste heat recovery, AI energy-saving automatic control, etc., become key policy-supported directions; green electricity consumption ratio requirements advance simultaneously with PUE control.
4. Regional division of labor more distinct: Eastern regions focus on existing potential tapping and technological innovation; western regions leverage climate and green electricity advantages to build low-cost, low-PUE computing bases, forming a policy support pattern for coordinated implementation of 'East Data West Computing' and 'East Training West Inference'.

## Full text (original)

随着“东数西算”战略深化推进，数据中心作为数字经济核心基础设施，其电能利用效率（PUE）成为绿色低碳发展的关键考核指标。2026年，全国34个省级行政区（省、自治区、直辖市、特别行政区）均明确了数据中心PUE管控要求，涵盖新建项目准入、存量项目改造、奖惩机制等核心内容，以下为全网最完整、最具体的政策汇总，适配企业落地、行业研究等各类需求。
2026各地数据中心PUE政策
01北京市
2026年起，北京对PUE超过1.35的数据中心开征差别电价。超限值1倍以内（PUE 1.35-1.7），加价0.2元/度；超1倍以上（PUE＞1.7），加价0.5元/度。
目标2027年全市年均PUE降至1.35以下，所有存量项目必须达标。
绿电方面，PUE越低，绿电比例要求反而越宽松：PUE≤1.2的绿电比例力争20%，1.2-1.35力争30%，高于1.35则要求达到40%。
节能改造项目最高可获3000万元奖励，节能量补贴最高1200元/吨标准煤，其他绿色项目按投资额30%补。同时，达标数据中心会被公示，鼓励高效项目整合低效设施承接业务迁移。
02上海市
2026年新建数据中心PUE力争控制在1.25，智算中心以1.25为硬门槛。
未来新建项目可能比1.25更严，并考虑跟进差别电价、扩大碳交易覆盖范围。
液冷、绿电交易+绿证是主要技术路径，万国数据浦江中心、网宿嘉定园区等已稳定运行在PUE 1.26以下。
03天津市
大型新建数据中心PUE≤1.3，中小型≤1.5；纳入京津冀枢纽节点的项目需≤1.25。
2026年底前，所有PUE＞1.5的存量项目必须完成改造，目标降至1.4以下，否则限制扩容。
新建PUE≤1.2的数据中心，每个机架补贴500元；存量改造后PUE下降0.2以上，按总投资10%补贴，上限1000万元。
04重庆市
成渝枢纽节点内新建数据中心PUE≤1.25，其他区域大型项目≤1.3，中小型≤1.5。
标杆项目需达国标1级能效。
鼓励与新能源企业“源网荷储”协同，PUE≤1.2且绿电消纳不低于50%的项目，可获额外补贴。
05河北市（含雄安新区）
2025年底已实现PUE＞1.3的大型、超大型存量数据中心全部关停退出，2026年巩固成果，严禁重启。新建项目优先支持可再生能源供电比例达50%以上；纳入京津冀枢纽节点的项目PUE≤1.25，其他区域大型项目≤1.3。
采用间接蒸发冷却、液冷等技术且PUE≤1.2的新建项目，按投资额8%补贴，上限500万元。
06山西省
2026年新建数据中心PUE≤1.3，存量改造后需降至1.4以下，2026年底前完成所有低效项目改造。
年均PUE首次低于1.18的数据中心，按物理机架最高1000元/个补贴，单企上限500万元。PUE≤1.2且绿电消纳比例≥60%的项目，额外给予补贴倾斜。
07内蒙古自治区
和林格尔、集宁等枢纽节点新建数据中心PUE严控在1.2以下，主推自然冷却。
PUE≤1.15的数据中心优先参与碳交易收益分配，依托绿电优势推动数据中心100%使用绿电。
08辽宁省
2026年新建数据中心PUE≤1.3，重点布局沈阳、大连“双核”及辽西增长极，新建项目必须同步配套节能设施。
存量改造后PUE需降至1.5以下，2026年底前完成，鼓励AI节能自控、余热回收。
辽西地区PUE≤1.25的项目，享受土地、电价优惠政策。
09吉林省
大型新建数据中心PUE≤1.25，中小型≤1.4。
2026年底前，PUE＞1.5的存量项目改造后需降至1.4以下，未达标暂停运营。
PUE≤1.2的数据中心，每度电补贴0.03元，连续补3年；鼓励与新能源项目协同。
10黑龙江省
2026年力争大型新建数据中心PUE降至1.25以下，依托风、光资源推动算电协同。存量项目持续推广间接蒸发冷却、AI节能自控等技术。
哈尔滨、大庆等城市优先布局，PUE≤1.2的项目可获用地、用能指标倾斜。
11江苏省
新建大型及以上数据中心须达绿色数据中心标准，PUE＜1.3，绿色低碳等级4A以上；中小型PUE不高于1.5。
2026年底前，PUE＞1.4的大型存量项目改造后需降至1.35以下。新建PUE≤1.2的数据中心，每机架补贴800元，单项目上限2000万元。
12浙江省
2026年全省普通数据中心PUE不高于1.5，平均不高于1.4；新建大型及以上PUE不高于1.3，长三角枢纽节点项目≤1.25。
PUE＞1.5的存量项目须在2026年6月底前完成改造，否则限电。PUE≤1.2享受每度电降0.05元优惠；PUE＞1.6加价0.3元/度。鼓励数据中心参与虚拟电厂调峰。
13安徽省（含芜湖集群）
芜湖集群：新建项目规模不低于3000标准机架，上架率不低于65%，PUE＜1.25。
PUE＞1.4且≤1.8加价0.11元/度，＞1.8加价0.5元/度。全省其他区域新建大型项目PUE≤1.3，中小型≤1.5；2026年底全省平均PUE降至1.35以下。
新建PUE≤1.2补贴投资额10%，上限1500万元；存量改造后PUE下降0.3以上，一次性补500万元。
14福建省
到2026年全省数据中心平均PUE低于1.35。新建大型项目PUE≤1.3，中小型≤1.5；纳入全国一体化算力网的项目需≤1.25。
重点依托数字福建（长乐、安溪）产业园，推广液冷、余热回收，探索绿电直供、数电联营。
15江西省
2026年新建及改扩建数据中心PUE一般不超过1.25，优先支持绿电占比高的项目。
全省平均PUE降至1.5以下，上架率高于60%。2026年底前完成PUE＞1.5的存量项目改造，鼓励液冷、新型储能，支持通过绿证绿电交易提升绿电消费比例。
16山东省
2026年新建大型以上数据中心设计PUE不高于1.3，鼓励采用浸没液冷、间接蒸发冷却。
2026年底前，全省大型以上存量项目实测PUE力争降至1.4以下。支持应用高压直流供电、模块化UPS、变频制冷、余热利用等技术，力争全年节约用电突破1亿度。
17河南省
新建大型项目PUE≤1.3，中小型≤1.5；纳入全国一体化算力网的项目PUE≤1.25，优先布局郑州、洛阳。
2026年底前，PUE＞1.5的存量项目改造后需降至1.4以下，否则不予审批扩容。
PUE≤1.2补贴0.04元/度，连续2年；绿电占比≥50%额外补贴。
18湖北省
鼓励各地推动数据中心与新能源企业“源网荷储”协同，形成算电一体供能体系。
新建大型项目PUE≤1.3，成渝枢纽相关项目≤1.25。支持宜昌、十堰打造绿色算力中心，PUE≤1.2的重点项目按投资额8%补贴，上限1000万元。
19湖南省
新建（改造）总算力50PFlops以上、PUE不高于1.3的智算基础设施项目，按设备和软件费用的10%补助，上限2000万元。
新建大型项目PUE≤1.3，中小型≤1.5；2026年底全省平均PUE降至1.35以下。PUE≤1.2的项目优先纳入省级绿色数据中心名录，享受税收优惠。
20广东省
国家枢纽节点内新建项目平均PUE不超过1.25，省内其他地区不超过1.3。
已建成项目须按PUE不高于1.5完成改造，2026年底前全部达标。PUE≤1.2每机架补贴600元；PUE＞1.6加价0.4元/度；绿电占比≥70%额外补贴。
21广西壮族自治区
到2026年，大型、超大型数据中心平均PUE低于1.3，其他类型不超过1.5。
2026年底前完成PUE超过1.5的项目改造。推广液冷、余热回收，优先支持绿电占比较高的新建、扩建项目，打造“一跳直达”直联网络。
22海南省
新建大型项目PUE≤1.3，中小型≤1.5。海底数据中心（UDC）依托海洋冷却优势，PUE控制在1.1以下。
数据中心绿电消纳比例不低于60%，PUE≤1.2且绿电比例≥80%的项目，按投资额15%补贴，上限3000万元。推动海底数据中心接入国家算力互联网。
23四川省（含天府集群）
天府集群内新建大型、超大型数据中心PUE＜1.25，一次性奖补2000万元；PUE＜1.15奖补3000万元。2026年全省机架规模达50万，上架率60%，平均PUE不高于1.3；集群起步区机架30万，上架率70%，PUE不高于1.25，可再生能源使用率85%。集群外平均上架率未达60%、平均PUE未达1.3的区域，原则上不得新建数据中心。
24贵州省（含贵安集群）
2026年全省数据中心平均PUE降至1.19，达到国标一级能效。算力规模目标190EFLOPS，“算力券”政策支持增至1.4亿元。
重点项目PUE控制在1.15以下。全省新建大型项目PUE≤1.25，智算占比已超97%，推广智能建筑平台、液冷等技术。
25云南省
2026年新建大型及以上数据中心绿色等级4A以上，PUE达到1.3以下。2026年底前完成PUE超1.5的存量项目改造。
PUE≤1.2的项目优先获得绿电直供及电价优惠。
26西藏自治区
新建大型数据中心PUE≤1.2，中小型≤1.4，利用高原低温优势推广自然冷却。
绿电消纳比例不低于90%，PUE≤1.15的项目可享受税收全额减免。
2026年底前完成PUE＞1.5的存量项目改造，改造后需降至1.4以下。
27陕西省
新建大型项目PUE≤1.25，中小型≤1.4；全国一体化算力网项目需≤1.2，优先布局西安、榆林。
2026年底前，PUE＞1.5的存量项目改造后需降至1.4以下，否则断电整改。PUE≤1.2按投资额10%补贴，上限2000万元。
28甘肃省（含庆阳集群）
庆阳集群：2026年起新建大型、超大型数据中心PUE≤1.20，单项目规模不低于3000标准机架，平均功率≥8kW，等级国标A级。
投产后PUE综合需≤1.20，1年内上架率≥65%。
全省其他区域新建大型项目PUE≤1.3，中小型≤1.5，鼓励绿色等级达G4及以上。
29青海省
新建（改扩建）大型及以上数据中心PUE严格控制在1.2以下，清洁能源利用率100%并可追溯。
2026年底前完成年均PUE＞1.5的功能落后数据中心腾退，严禁低效项目扩容。
出台绿色算力认证规则，强化PUE全流程管控。
30宁夏回族自治区
新建大型数据中心PUE≤1.2，中小型≤1.4；依托光伏、风电优势，绿电消纳比例≥80%。
新建PUE≤1.15的项目，每机架补贴1000元，单项目上限2000万元。
2026年底前完成PUE＞1.5的存量项目改造，改造后PUE≤1.2的，按投资额8%补贴。
31新疆维吾尔自治区
依托低温气候和绿电资源，现有数据中心PUE普遍在1.08-1.15之间，克拉玛依、昌吉标杆项目已达1.13、1.08、1.15。
2026年新建大型项目PUE≤1.2，中小型≤1.4，优先支持绿电直供，推动100%可再生能源。重点在克拉玛依、昌吉布局，承接东部高能耗算力。
32香港
新建数据中心PUE≤1.3，大型项目（机架≥1000个）≤1.25，禁止新建PUE＞1.35。
2026年底前完成PUE＞1.5的存量项目改造，改造后需降至1.4以下，否则不续运营牌照。
PUE≤1.2的电费补贴0.1港元/度，连续3年。
33澳门
新建数据中心PUE≤1.35，中小型≤1.5，服务于数字政务、文旅的项目优先，PUE≤1.25可获政府资金支持。PUE≤1.3且绿电消纳≥50%，按投资额5%补贴。
2026年底前完成PUE＞1.6的存量项目改造，改造后需降至1.5以下。
34台湾省
新建大型数据中心PUE≤1.3，中小型≤1.5；“数位台湾”重点项目需≤1.25。
2026年底前完成PUE＞1.5的存量项目改造，改造后需降至1.4以下。
PUE≤1.2的企业所得税降低5个百分点，鼓励与新能源项目协同。
2026PUE政策核心趋势
1、门槛全面收紧：新建大型数据中心PUE普遍要求在1.3以下，枢纽节点项目多数收紧至1.25，西部部分优势区域已压至1.2以内，上海酝酿进一步加严。
2、奖惩双向发力：差别电价、惩罚性电价、限电腾退与资金补贴、税收减免并行实施，北京、芜湖等地已出台明确的加价细则。
3、技术路线清晰化：液冷、自然冷却、余热回收、AI节能自控等成为政策重点支持方向，绿电消纳比例要求与PUE管控同步推进。
4、区域分工更加明确：东部侧重存量挖潜和技术创新，西部依托气候与绿电优势打造低成本、低PUE算力基地，形成“东数西算”与“东推西训”协同落地的政策支撑格局。
