# Vertiv launches first converged physical infrastructure digital twin for NVIDIA Omniverse DSX to accelerate AI factory design and simulation

- Source: Vertiv Newsroom (T1)
- Published: 2026-06-01
- Score: 74.0
- Tags: Product launch, Datacenter
- Companies: Vertiv, NVIDIA
- Original: https://www.vertiv.com/en-us/about/news-and-events/corporate-news/2026/vertiv-introduces-first-converged-physical-infrastructure-digital-twin-for-nvidia-omniverse-dsx/

## Intelligence brief

### What happened

On June 1, 2026, Vertiv (NYSE: VRT), a global leader in critical digital infrastructure, announced the introduction of a production-grade digital twin capability for its Vertiv™ SmartRun solution, integrated with the NVIDIA Omniverse DSX Blueprint. This digital twin enables model-based design, simulation, and validation of AI factory infrastructure—covering power, cooling, controls, and deployment workflows—as a single interdependent system before physical build-out. The announcement was made at Computex Taipei 2026, where Vertiv demonstrated the digital twin using Dassault Systèmes' model-based systems engineering capabilities on the 3DEXPERIENCE platform, connected to NVIDIA Omniverse DSX workflows. This is the first phase of Vertiv's multi-phase AI factory digital twin roadmap, aimed at closing the gap between accelerated compute innovation and physical infrastructure readiness.

### Key figures

- No specific figures disclosed regarding investment, capacity, or timeline.
- The digital twin is described as "production-grade" and is the first phase of a multi-phase roadmap.
- Demonstration at Computex Taipei 2026.

### Why it matters to ebm-papst

Vertiv's digital twin capability represents a significant advancement in AI factory infrastructure planning, directly addressing the challenge of scaling data centers to higher densities and capacities. For ebm-papst, this development signals a shift toward model-based, simulation-driven design workflows in the data center and AI infrastructure market. As a leading supplier of fans and motors for cooling and ventilation, ebm-papst could see increased demand for products that are compatible with digital twin environments and simulation-ready assets. However, Vertiv's integration with NVIDIA Omniverse and Dassault Systèmes may set new industry standards for infrastructure design, potentially creating competitive pressure if ebm-papst's products are not easily integrated into such workflows. 

Assessment (inference): Vertiv's digital twin could accelerate the adoption of AI factories, driving demand for high-performance cooling solutions where ebm-papst's products are critical. However, if ebm-papst does not proactively ensure its product data and models are compatible with platforms like NVIDIA Omniverse, it may risk being excluded from early design phases. ebm-papst should consider developing digital twin-ready product models and collaborating with ecosystem partners to maintain relevance in this evolving market.

## Full text (original)

Model-based digital twin capability of Vertiv™ SmartRun helps accelerate AI factory design, simulation and deployment workflows
COLUMBUS, Ohio [June 1, 2026] – Vertiv (NYSE: VRT), a global leader in critical digital infrastructure, today announced progress on a production-grade digital twin capability for Vertiv™ SmartRun integrated in the NVIDIA Omniverse DSX Blueprint, advancing the company’s roadmap to make AI factory infrastructure more configurable, repeatable, and simulation-ready.
As AI deployments scale to higher densities and larger capacities, data centers need a faster, more reliable way to turn each generation of computing into real-world infrastructure. Traditional, document-based processes and siloed handoffs across power, cooling, controls, and deployment teams can’t keep pace. Vertiv SmartRun digital twin shifts planning to a model-based approach, allowing infrastructure to be designed, simulated, and validated as a single system before build-out. By capturing system configurations and dependencies in a virtual environment, it helps reduce late-stage design changes and integration risk, improve confidence through simulation, and accelerate time from planning to operational readiness—while improving coordination across teams.
“AI infrastructure can no longer be planned one compute generation at a time,” said Scott Armul, chief product and technology officer at Vertiv. “To deliver more tokens per second per megawatt, customers need power, cooling, controls, and deployment workflows to be designed as one interdependent system. The Vertiv SmartRun digital twin helps encode Vertiv’s infrastructure expertise into configurable, simulation-ready building blocks that support faster, more confident AI factory planning. As we extend this approach to Vertiv™ OneCore Rubin DSX, Vertiv is helping customers translate future compute requirements into deployable physical infrastructure before those requirements reach full deployment scale.”
The Vertiv SmartRun digital twin is the first phase in Vertiv’s multi-phase AI factory digital twin roadmap. Digital twins are designed to help close the gap between accelerated compute innovation and physical infrastructure readiness, preserving engineering intent from early configuration and simulation through deployment, commissioning, lifecycle assurance, and future optimization.
“AI factories require full-stack co-design across compute and physical infrastructure,” said Vladimir Troy, vice president of AI Infrastructure at NVIDIA. “NVIDIA Omniverse DSX Blueprint helps the ecosystem build, simulate, and optimize gigawatt-scale AI factory digital twins using OpenUSD, SimReady assets, and power, thermal, and operational simulations. Bringing Vertiv SmartRun into this workflow can help customers evaluate infrastructure choices earlier and prepare for multiple generations of accelerated computing.”
At Computex Taipei 2026, Vertiv will demonstrate Vertiv™ SmartRun as both a physical infrastructure system and a configurable digital twin, allowing attendees to explore configuration scenarios and see how model-based design choices can support downstream infrastructure planning, coordination, and simulation workflows. Created using Dassault Systèmes model-based systems engineering capabilities on the 3DEXPERIENCE platform and connected to NVIDIA Omniverse DSX workflows, the demonstrator establishes a shared digital foundation for configuration, simulation, validation, and future optimization across the AI factory infrastructure lifecycle.
“Digital twins allow complex infrastructure systems to be represented with the intelligence of their configuration rules, dependencies, and engineering intent,” said Stéphane Sireau, vice president of high tech industry at Dassault Systèmes. “At Computex, Vertiv, Dassault and NVIDIA demonstrate how Vertiv’s AI factory infrastructure is moving from document-based design workflows toward an industrialized, model-based systems engineering approach optimized for speed, quality, and system-level performance.”
See the video “Simulation-ready converged physical infrastructure for AI at scale” to learn more about leveraging digital twin for Vertiv’s solutions for AI infrastructure, or visit Vertiv.com.
About Vertiv
Vertiv (NYSE: VRT) brings together hardware, software, analytics and ongoing services to enable its customers’ vital applications to run continuously, perform optimally and grow with their business needs. Vertiv solves the most important challenges facing today’s data centers, communication networks and commercial and industrial facilities with a portfolio of power, cooling and IT infrastructure solutions and services that extends from the cloud to the edge of the network. Headquartered in Westerville, Ohio, USA, Vertiv does business in more than 130 countries. For more information, and for the latest news and content from Vertiv, or visit Vertiv.com.
Forward-looking statements
This release contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, Section 27 of the Securities Act, and Section 21E of the Securities Exchange Act. These statements are only a prediction. Actual events or results may differ materially from those in the forward-looking statements set forth herein. Readers are referred to Vertiv’s filings with the Securities and Exchange Commission, including its most recent Annual Report on Form 10-K and any subsequent Quarterly Reports on Form 10-Q for a discussion of these and other important risk factors concerning Vertiv and its operations. Vertiv is under no obligation to, and expressly disclaims any obligation to, update or alter its forward-looking statements, whether as a result of new information, future events or otherwise.
CONTACT
Ruder Finn
E Vertiv@RuderFinn.com
